• Latest
  • Trending
Reconstruction Begins on Akute-Lambe-Agbado Road as Ogun Govt Moves to Ease Transportation Woes

We’ll Deliver Durable Roads, Ogun Project Contractors Vow

June 21, 2025
Abiodun, Adeola rally APC supporters ahead of 2027 elections

Abiodun, Adeola rally APC supporters ahead of 2027 elections

September 11, 2026
FG Begins Free 100MB Daily Data for Students October 1

FG Begins Free 100MB Daily Data for Students October 1

September 10, 2026
2027: Don’t Be Swayed By Campaign Promises, Adegoke Tells Voters

2027: Don’t Be Swayed By Campaign Promises, Adegoke Tells Voters

September 10, 2026
Osun: Election petition withdrawal will save public funds, reduce tension, says Adegoke SAN

Osun: Election petition withdrawal will save public funds, reduce tension, says Adegoke SAN

September 10, 2026
Withdrawal of Osun election petitions not admission of fair poll, says Adegoke

Withdrawal of Osun election petitions not admission of fair poll, says Adegoke

September 10, 2026
2027: Yayi, Abiodun Promise Tinubu 2m Votes From Ogun

2027: Yayi, Abiodun Promise Tinubu 2m Votes From Ogun

September 10, 2026
33-Year-Old Man Arrested For Alleged Railway Fence Vandalism In Ogun

33-Year-Old Man Arrested For Alleged Railway Fence Vandalism In Ogun

September 10, 2026
Pregnant woman, alleged accomplice arrested over attempted house break-in in Ogun

Pregnant woman, alleged accomplice arrested over attempted house break-in in Ogun

September 10, 2026
Omosanya Jamaldeen Olafimihan at 2: A Mother’s Heartfelt Tribute to Her Precious Son

Omosanya Jamaldeen Olafimihan at 2: A Mother’s Heartfelt Tribute to Her Precious Son

September 10, 2026
ODU’ACCIMA Celebrates Gov Abiodun at 65, Applauds Economic Gains in Six Years

Abiodun And The Women’s Agenda: Empowering Women, Strengthening Families, Securing Ogun

September 10, 2026
Eid-ul-Fitri: So-Safe Corps Deploys 900 Personnel Across Ogun

42-Year-Old Farmer Arrested for Alleged Defilement of 12-Year-Old Girl in Ogun

September 10, 2026
Police Arrest 27-Year-Old Woman Over Fake OPay Shutdown Notice

Police Arrest 27-Year-Old Woman Over Fake OPay Shutdown Notice

September 10, 2026
Tropic Reporters
Friday, September 11, 2026
About Us
Advertise
  • Home
  • News
  • Politics
  • Business
  • Sports
  • Culture
  • Health
  • Opinion
  • Special Reports
  • Entertainment
  • Lifestyle
No Result
View All Result
Tropic Reporters
No Result
View All Result

We’ll Deliver Durable Roads, Ogun Project Contractors Vow

by Tropic Reporters
June 21, 2025
in News
0
Reconstruction Begins on Akute-Lambe-Agbado Road as Ogun Govt Moves to Ease Transportation Woes
0
SHARES
33
VIEWS
Share on WhatsappShare on FacebookShare on Twitter

Contractors handling major road projects across Ogun State have pledged to deliver quality infrastructure that will not only meet government specifications but also stand the test of time.

The assurance came from various construction firms currently working on strategic roads in different parts of the state.

They commended the significant investment by the Ogun State Government in infrastructure, promising that the quality of work would reflect the confidence reposed in them.

RELATED NEWS

FG Begins Free 100MB Daily Data for Students October 1

2027: Don’t Be Swayed By Campaign Promises, Adegoke Tells Voters

Osun: Election petition withdrawal will save public funds, reduce tension, says Adegoke SAN

Withdrawal of Osun election petitions not admission of fair poll, says Adegoke

33-Year-Old Man Arrested For Alleged Railway Fence Vandalism In Ogun

At the Ilisan-Akaka-Isara road project, spanning 12.3 kilometers, the site engineer for Still Earth Construction and Realty, Engr. Ifeanyi Ugorji, confirmed that the project was already 73 percent complete and on track for delivery before the August deadline.

“We are prioritizing the drainage because we need it to protect the embankment and the pavement itself. As soon as we’re done with the drainage, we’ll begin the earthwork, which is the most critical part,” he said.

He also noted that 60 percent of the asphalt overlay from the starting point of the road has been completed.

In Ijebu-Ode, where Fort Hermon Construction is handling three roads—Tam-Balogun (0.85km), Osinubi (1.1km), and Obalende-Abeokuta (12.5km)—site engineer Engr. Michael Umeh reported that clearing, excavation, stone base, and drainage construction have been completed.

“Despite the rain slowing us down, our reputation is built on quality job delivery. We’re forging ahead,” he stated.

At the Sagamu-Iperu-Ode-Saapade corridor, Hi-Tech Construction’s site supervisor, Ghassan Moussa, said the second phase of the project is underway and progressing steadily.

“We’ve completed 60 percent so far. We’re extending both sides of the road, laying the stone base, and will commence asphalting shortly. Quality remains our hallmark,” Moussa assured.

Meanwhile, Craneburg, the company overseeing the Akute-Ijoko road, has completed excavation on a 500-meter stretch and is set to begin drainage construction. Site supervisor Engr. Michael Akam emphasized the company’s commitment to excellence.

“We’ve done about 500 meters. It’s a standard road with drains on both sides. We’re known nationwide for quality work, and this will be no different,” Akam said.

Tags: Akute-IjokoConstructionCraneburgFort HermonHi-TechIjebu-Ode roadsIlisan-Akaka-IsaraInfrastructureOgun StateQuality AssuranceRoad ProjectsSagamu-IperuStill Earth
SendShareTweet

Related Posts

FG Begins Free 100MB Daily Data for Students October 1
News

FG Begins Free 100MB Daily Data for Students October 1

September 10, 2026
2027: Don’t Be Swayed By Campaign Promises, Adegoke Tells Voters
News

2027: Don’t Be Swayed By Campaign Promises, Adegoke Tells Voters

September 10, 2026
Osun: Election petition withdrawal will save public funds, reduce tension, says Adegoke SAN
News

Osun: Election petition withdrawal will save public funds, reduce tension, says Adegoke SAN

September 10, 2026
Withdrawal of Osun election petitions not admission of fair poll, says Adegoke
News

Withdrawal of Osun election petitions not admission of fair poll, says Adegoke

September 10, 2026
33-Year-Old Man Arrested For Alleged Railway Fence Vandalism In Ogun
News

33-Year-Old Man Arrested For Alleged Railway Fence Vandalism In Ogun

September 10, 2026
Pregnant woman, alleged accomplice arrested over attempted house break-in in Ogun
News

Pregnant woman, alleged accomplice arrested over attempted house break-in in Ogun

September 10, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent News

Abiodun, Adeola rally APC supporters ahead of 2027 elections

Abiodun, Adeola rally APC supporters ahead of 2027 elections

September 11, 2026
FG Begins Free 100MB Daily Data for Students October 1

FG Begins Free 100MB Daily Data for Students October 1

September 10, 2026
2027: Don’t Be Swayed By Campaign Promises, Adegoke Tells Voters

2027: Don’t Be Swayed By Campaign Promises, Adegoke Tells Voters

September 10, 2026
00:00:00
Tropic Reporters

Copyright Notice
All content on Tropic Reporters is protected by copyright laws and belongs exclusively to us. Unauthorized use, reproduction, or distribution is prohibited.

You may access and share content for personal, non-commercial purposes with proper attribution. For permissions or collaborations, contact us via our official channels.

00:00:00

Recent News

  • Abiodun, Adeola rally APC supporters ahead of 2027 elections
  • FG Begins Free 100MB Daily Data for Students October 1
  • 2027: Don’t Be Swayed By Campaign Promises, Adegoke Tells Voters

Subscribe to Tropic Reporters News

Stay informed with Tropic Reporters, your trusted source for breaking news, exclusive stories, and in-depth reports on national and international issues.

  • Home
  • About Us
  • Contact Us
  • Privacy Policy

© 2025 Tropic Reporters. All Rights Reserved.

No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Sports
  • Culture
  • Health
  • Opinion
  • Special Reports
  • Entertainment
  • Lifestyle

© 2025 Tropic Reporters. All Rights Reserved.